Loading
Preparing this view
Retrieving the current information and preserving your place. No action is required.
Loading
Retrieving the current information and preserving your place. No action is required.
Loading
Retrieving the current information and preserving your place. No action is required.
Market 85.0% against model 73.6%. Resolves in 47d 15h, data updated 13d ago.
Decision layer
The model disagreement survives the current gates. This is still research context, not financial advice.
Expected value after costs, not raw probability spread.
How much support the model sees across available inputs.
Thin markets can erase apparent edge through spread and slippage.
Resolution ambiguity, timing, and data quality pressure the decision.
Why / why not trade
This public box mirrors the internal diagnostic style without exposing execution controls: decision, probability gap, cost-adjusted edge, blocker, and next thing to monitor.
side NO
73.6% model / 85.0% market
fees, spread, slippage, risk
Model edge survives the current public research gates.
Watch whether the market price moves toward or away from the model.
Model 73.6% vs market 85.0%.
Raw disagreement is reduced by fees, spread, slippage, and risk controls.
Model leans NO
The model-market gap currently survives the decision gates, but it is still research context and must be judged against the public track record.
Sign in to return to this exact question, review governed evidence, and record an append-only probability without exposing private thesis text.
usable feature coverage.
Volume $456,931
The model estimates a 11-point lower probability than the market, primarily driven by historical base rate.
| FACTOR | SIGNAL | WEIGHT | LOG-ODDS ΔLog-odds contribution measures how much each factor shifted the model's probability estimate in log-odds space — the mathematically correct way to stack independent evidence. Formula: Δlog-odds = weight × signal. Positive values push the probability up; negative values push it down. Log-odds are converted back to probability via the logistic function at the end. | DIRECTION | DESCRIPTION |
|---|---|---|---|---|---|
| Historical base rate | 71% | — | +0.895 | Bullish | Historical frequency for this kind of event — the prior before any market-specific evidence. |
| Cross-market divergence | —This factor was not available for this market. No approved cross-venue link exists for this market. | 0.20 | — | — | Whether the same event is priced differently on another venue. A gap may signal an opportunity or a structural difference. |
| 7-day price momentum | —This factor was not available for this market. This factor was not available for this market. | 0.35 | — | — | 7-day drift in the market's own implied probability. Sustained directional moves carry information. |
| BTC/ETH 7-day momentum | —This factor was not available for this market. This factor applies to crypto markets only. | 0.20 | — | — | 7-day Bitcoin or Ethereum return, normalized. Applied to crypto-category markets only. |
| Rate surprise | |||||
| Model probability | 71.0% | Prior: 71% · Market: 85.0% | |||
| Confidence (λ)Confidence λ (lambda) controls how much weight to give the model vs. the market. Formula: p_final = λ·p_model + (1−λ)·p_market. λ is derived from data quality, factor agreement, and liquidity. When inputs are weak, the model shrinks toward the market — not toward 50%. | 0.81 | Final: 73.6% = λ·model + (1−λ)·market | |||
No comparable events matched for this market.
This market will resolve to “Yes” if, according to the ISW map, Russia captures the Kostyantynivka railroad station located on Pravoberezhna vulytsia by September 30, 2026 at 11:59 PM ET. The railroad station will be considered captured if any part of the train station icon is shaded red on the ISW map (https://storymaps.arcgis.com/stories/36a7f6a6f5a9448496de641cf64bd375) by the resolution date. If the area is not shaded red by September 30, 2026, 11:59 PM ET, the market will resolve to “No”. For any change on the ISW map to qualify for this market’s resolution, the relevant shading indicating Russian control must persist through the next full ISW daily update cycle. If ISW skips a day, shading must persist until the next finalized ISW update is published, regardless of the date. Any continuous shading which reflects either “Assessed Russian Control”, “Assessed Russian Advance In Ukraine”, or “Assessed Russian Gains in the Past 24 Hours” will qualify. “Assessed Russian Infiltration Areas in Ukraine” will not qualify. If Russia comes into control of this territory as a result of a negotiated settlement, this will qualify for a 'Yes' resolution, regardless of if it is shaded red in the ISW map. An announcement of a negotiated settlement which gives Russia de jure control will not qualify. Actual control must be established. Once Russia captures the railroad station, any subsequent loss of control will not be considered towards the resolution of this market. Train Station Location: https://polymarket-upload.s3.us-east-2.amazonaws.com/Kostyantynivka3.jpg Train Station Location in Kostyantynivka: https://polymarket-upload.s3.us-east-2.amazonaws.com/Kostyantynivka2.jpg Kostyantynivka Location: https://polymarket-upload.s3.us-east-2.amazonaws.com/Kostyantynivka1.jpg Location on Google maps: https://maps.app.goo.gl/hZ6ch5jVRvkNFY317 The primary resolution source for this market will be the ISW Ukraine map. If the ISW map is rendered unavailable, information from D
analyzed by heuristicThis market will resolve to “Yes” if, according to the ISW map, Russia captures the Kostyantynivka railroad station located on Pravoberezhna vulytsia by September 30, 2026 at 11:59 PM ET. The railroad station will be considered captured if any part of the train station icon is shaded red on the ISW map (https://storymaps.arcgis.com/stories/36a7f6a6f5a9448496de641cf64bd375) by the resolution date. If the area is not shaded red by September 30, 2026, 11:59 PM ET, the market will resolve to “No”. For any change on the ISW map to qualify for this market’s resolution, the relevant shading indicating Russian control must persist through the next full ISW daily update cycle. If ISW skips a day, shading must persist until the next finalized ISW update is published, regardless of the date. Any continuous shading which reflects either “Assessed Russian Control”, “Assessed Russian Advance In Ukraine”, or “Assessed Russian Gains in the Past 24 Hours” will qualify. “Assessed Russian Infiltration Areas in Ukraine” will not qualify. If Russia comes into control of this territory as a result of a negotiated settlement, this will qualify for a 'Yes' resolution, regardless of if it is shaded red in the ISW map. An announcement of a negotiated settlement which gives Russia de jure control will not qualify. Actual control must be established. Once Russia captures the railroad station, any subsequent loss of control will not be considered towards the resolution of this market. Train Station Location: https://polymarket-upload.s3.us-east-2.amazonaws.com/Kostyantynivka3.jpg Train Station Location in Kostyantynivka: https://polymarket-upload.s3.us-east-2.amazonaws.com/Kostyantynivka2.jpg Kostyantynivka Location: https://polymarket-upload.s3.us-east-2.amazonaws.com/Kostyantynivka1.jpg Location on Google maps: https://maps.app.goo.gl/hZ6ch5jVRvkNFY317 The primary resolution source for this market will be the ISW Ukraine map. If the ISW map is rendered unavailable, information from DeepStateMap (https://deepstatemap.live/) may be used. If information from both the ISW and DeepStateMap are rendered permanently unavailable, a consensus of credible reporting may be used. Note: Any temporary glitches or errors in the map which will not be considered.
- Oracle dependency Resolution depends on a single named source continuing to publish the metric.
Paper position only. No real-money execution
| —This factor was not available for this market. This factor applies to Fed, CPI, and macro markets only. |
| 0.25 |
| — |
| — |
| 2-year Treasury yield reaction in the 48 hours after the most recent scheduled release — a proxy for how markets interpreted the data versus expectations. |
| Yield curve shift | —This factor was not available for this market. This factor applies to Fed, CPI, and macro markets only. | 0.15 | — | — | 30-day change in the 10-year minus 2-year Treasury spread. A flattening curve signals tightening expectations; steepening signals easing. |
| News signal | —This factor was not available for this market. No news signal available for this market in the past 14 days. | 0.25 | — | — | Reliability-weighted direction of relevant news from the past 14 days. Official sources (filings, agency statements) carry more weight than commentary. |
| Crowd forecast | —This factor was not available for this market. Insufficient forecasters to compute crowd signal. Requires at least 5 calibration-weighted estimates. | 0.20 | — | — | Calibration-weighted average of user probability estimates. Only applied when 5 or more weighted forecasters have submitted estimates. |
Resolves Wed, 30 Sep 2026 12:00:00 GMT. The contract pays on these exact criteria, not on the thesis.
Since the first stored model read on 2026-08-01, the market has moved from 85.0% to 85.0%.
This is a directional diagnostic for unresolved markets, not final performance. Resolved outcomes still determine the official live record.
Missing: Cross-market divergence, 7-day price momentum, News signal, Crowd forecast
When features are unavailable, the model increases uncertainty and weights the final estimate closer to the market price. Lower data quality does not mean the market is wrong. It means the model is being appropriately humble.
| Inverse liquidity | 22 | |
| Price volatility | 24 | |
| Resolution proximity | 0 | |
| Data quality | 30 | |
| Category base risk | 80 | |
| Resolution ambiguity | 18 | |
| Regulatory exposure | 0 | |
| Portfolio concentration | 0 |
Composite score 27/100, higher = riskier.
| Market | Mkt | Delta |
|---|---|---|
| Category context | ||
| US x Iran diplomatic meeting by July 31, 2026? category context: same category + wording overlap | 0.1% | -- |
| Will Iran announce withdrawal from MOU negotiations by July 31? category context: same category + wording overlap | 0.3% | -- |
| US announces end of Iranian blockade by July 31, 2026? category context: same category + wording overlap | 0.4% | -- |
| Will Donald Trump publicly insult Vladimir Putin by July 31, 2026? category context: same category + wording overlap | 0.7% | -- |
| Iran full airspace closure by July 31? category context: same category + wording overlap | 2.3% | -- |
Divergences > 5pt flagged in amber. For cross-venue pricing, see the Scanner.